Delivering EPA best practice
Goldsmith is an industry leader in the landfill space. We are one of only a select few in Victoria who can deliver landfill projects not only on time, but most importantly to the EPA’s strict Best Practice Environmental Management standards. During the past 12 years, we’ve constructed more than 30 landfill cells, caps and leachate ponds and have also managed the acceptance and burial of waste at landfill sites both in Victoria and the ACT.
OUR CAPABILITIES
_________
- Clay, GCL, HDPE and LLDPE liners
- Geocomposite and aggregate leachate drainage layers
- Cushion and separation geotextile layers
- Landfill gas extraction and leachate collection systems
- Groundwater drainage systems and pumps
- Waste relocation and disposal, including asbestos materials
- Independent verification by third party quality assurance consultants and EPA appointed environmental auditors
PROJECTS
WOLLERT LANDFILL
CELL 13 AND 14
_________
- Two composite-lined landfill cells each covering 5.5ha at Hanson’s Wollert Landfill
- 210,000m3 of bulk earthworks including 72,000m3 of compacted clay liner
- 11ha of GCL, HDPE cushion and separation geotextile layers installed
- 6.9km of HDPE leachate pipelines varying from 160mm to 315mm diameter
- 30,000m3 of leachate drainage aggregate placed
WOLLERT LANDFILL CAP
CELLS 7 AND 8
_________
- Construction of a 4ha composite lined landfill cap of Cells 7 and 8 using GCL, LLDPE and drainage geocomposite covered with 1m thick scalps. Works included ancillary roads, drainage and modification to leachate reinjection and gas extraction systems
- Construction of a 2ha interim landfill cap of Cell 8 including geocomposite liner, 500mm thick layer of scalps, ancillary roads and drainage
DRYSDALE LANDFILL
CELLS 5 AND 6
_________
- Construction of two 4.5ha landfill cells for the City of Greater Geelong
- The composite lined cells included clay, GCL and HDPE liners
- 3.5km of HDPE leachate collection pipelines and 300mm thick drainage aggregate layers
- Relocation of 40,000m3 of asbestos contaminated waste to the active cell
- Construction of a lysimeter trial pad for the proposed evapotranspiration cap
MARYVALE LANDFILL
CAP STAGE 1
_________
- Construction of a reinforced 1.4ha composite-lined landfill cap on top of highly unstable paper waste
- 2.2km long HDPE pipe gas collection system
- Supply and placement of 24,000m3 of engineered fill, clay liner, subsoil and topsoil
- Supply and installation of 1.4ha of LLDPE and GCD
- Construction of access roads, subsurface and surface drains including gabion drop structure
WESTS RD
CELL 4C
_________
- Construction of a 10ha composite-lined landfill cell to BPEM standards
- Screening, processing excavation, placement and testing of 200,000m3 of conforming subgrade fill and clay liner materials
- 10ha of HDPE liner, cushion and filter geotextiles supplied, installed and quality assured
- Leachate drainage layer including 6.6km of HDPE pipelines and 30,000m3 of drainage aggregate placed over geosynthetic layers